cross-posted from: https://lemmy.world/post/23761994

NASA’s Commercial Lunar Payload Services, or CLPS, initiative aims to deliver science and technology payloads to the Moon using commercial landers. CLPS is what brought Intuitive Machines’ Odysseus lander to the Moon in February 2024, marking the first U.S. Moon landing since Apollo.

In 2025, NASA has several CLPS missions planned, including deliveries by companies Astrobotic, Intuitive Machines and Firefly Aerospace.

In February 2025, NASA plans to launch the Spectro-Photometer for the History of the Universe, Epoch of Reionization and Ices Explorer, or SPHEREx, observatory. This mission will survey the sky in near-infrared light, which is a type of light that is invisible to the naked eye but that special instruments can detect.

The European Space Agency, or ESA, plans to conduct an orbital test flight of its Space Rider uncrewed spaceplane in the third quarter of 2025. Space Rider is a reusable spacecraft designed to carry out various scientific experiments in low Earth orbit.

Japan’s M2/Resilience mission, scheduled for January 2025, will launch a lander and micro-rover to the lunar surface.This mission will study the lunar soil to understand its composition and properties. Researchers will also conduct a water-splitting test to produce oxygen and hydrogen by extracting water from the lunar surface, heating the water and splitting the captured steam. The generated water, oxygen and hydrogen can be used for enabling long-term lunar exploration.

  • rumba@lemmy.zip
    link
    fedilink
    English
    arrow-up
    3
    ·
    5 days ago

    Maybe get wanna hold off till the new administration reshuffles money and priorities.

      • rumba@lemmy.zip
        link
        fedilink
        English
        arrow-up
        3
        ·
        5 days ago

        They don’t have to touch the budget to make an effect day one. He’s essentially free to fire whoever he wants. When a project don’t see traction, watch SpaceX swoop in to save the day.