• cordlesslamp@lemmy.today
        link
        fedilink
        arrow-up
        2
        arrow-down
        3
        ·
        edit-2
        5 months ago

        I’m curious, does a 3 minutes power down to replace a RAM stick is that much of a deal in enterprise server that they need to invented a whole new technology just for that?

          • kaboom36@ani.social
            link
            fedilink
            arrow-up
            3
            ·
            5 months ago

            The surplus enterprise hardware I have in my homelab takes 3 minutes to just get to BIOS

        • frezik@midwest.social
          link
          fedilink
          arrow-up
          12
          ·
          5 months ago

          Yes. Server boot times are long. Enterprise level NICs and hard drive controllers do a lot of checking at startup.

          Historically, there were Sun servers that could hot swap CPUs. X86 can’t do that, though.

          • psvrh@lemmy.ca
            link
            fedilink
            arrow-up
            1
            ·
            5 months ago

            Many that weren’t based on x86 microcompters could do this: Tandem, I mean, Compaq, I mean HP NonStop machines, Sun Ultra Enterprise as you mentioned, IBM s390 and System-Z, several HPUX systems, I’m sure there’s others.

        • Maalus@lemmy.world
          link
          fedilink
          arrow-up
          6
          ·
          5 months ago

          First of all, yeah. In enterprise, 1000 transactions per second can be a requirement. Second, enterprise servers take longer to spool up than 3 minutes.