• CaptainBasculin@lemmy.ml
    link
    fedilink
    arrow-up
    0
    ·
    7 months ago

    Energy generation requires intense planning as the amount generated has to be spent immediately.

    Reason all countries require some sort of permission before installing solar power to your roof is this; as you can’t just add more power to your grid without addressing proper storage for excess electricity or decreasing certain plant outputs.

    • orrk@lemmy.world
      link
      fedilink
      arrow-up
      0
      ·
      7 months ago

      decreasing certain plant outputs.

      let’s be honest, this is the real threat, oil/coal/natgas based power production would take a hit midday, because at the end of the day, the shareholder is simply more equal than you are, and he is owed the income

      • aubeynarf@lemmynsfw.com
        link
        fedilink
        arrow-up
        1
        ·
        6 months ago

        no, it’s an engineering reason. The total energy into the grid has to equal the total energy out, and large generation plants can’t just be spun up and down at will. The generation network has to coordinate changes in capacity and synchronize resulting line frequency shifts.